X

Forsyth Big Creek Greenway Phase 1 to Open Just in Time to Work Off that Leftover Turkey

Forsyth Big Creek Greenway Phase 1 End of Trail

Phase 1 of the Forsyth County Big Creek Greenway trail was originally scheduled to open in early/mid November. With all the heavy rains and flooding in the area recently, that has been pushed back. It is now scheduled to open on December 2nd, just after Thanksgiving and just in time to exercise away those leftover turkey sandwiches.

The longest phase of the Forsyth Greenway, Phase 1 stretches between McFarland Parkway and Atlanta Highway 9.  It offers more of the same as Phase 2 and 3 with a mixture of paved areas and boardwalks.  The additional 4.5 miles of trail will make the Forsyth Greenway a popular spot for biking making the total trail 6.7 miles long (13.4 miles roundtrip.) [Phase 1 First Impressions]

So enjoy Thanksgiving break and get out to the Greenway while the weather is nice to make room for the winter holidays right around the corner.  Oh yeah, and have a Happy Thanksgiving!

Jeff: Jeff has lived in the North Atlanta Metro Area for most of his life. Growing up in Lilburn, GA, he has been a fan of hiking, biking, and boating since he was little. Now he lives with his wife and two sons in Cumming, GA. He walks the Forsyth Big Creek Greenway regularly and bikes it occasionally.